ORANGE AVENUE CORRIDOR STUDY

Orange Avenue serves as a primary vehicular link from surrounding neighborhoods into Downtown Eustis. The goal of the Corridor Study was to create a safe and aesthetically enhanced corridor that motivated walking and biking activity.  Road diet techniques were utilized to calm traffic trough the use of bike lanes, turn lands, landscape medians, and traffic signals and traffic circles.  Streetscape improvements will also include street tree planting and sidewalk enhancements.

Status: Feasibility Study/ 2012
Client: City of Eustis, FL
Location: Eustis, FL
Project Team: Glenn LaRue Smith, Principal / Design Concepts; Vinson J. Camacho, Design Associate
Collaboration: Smith + Murray studios – Prime Griffey Engineering, Inc.